Performance Test Cell Upgrade / Detroit Diesel Corp / Detroit, MI

Project Overview:

As part of the DDC development program for the off-highway engine line, ACS delivered four performance test cells along with corresponding control rooms and a 5,000 sq.ft. mechanical penthouse. The complex renovation was executed in an operating test and production environment and was delivered utilizing a phased workplan to meet the needs of ongoing operations.

 Key Performance Features:

  • Mechanical penthouse was built utilizing open space on existing facility roof.
  • Maximized existing available space by converting the component test area into a new control room and emissions equipment room.
  • Siemens PLC systems installed for testing critical utilities including combustion air, fuel systems, engine coolant, aftercooler, and engine exhaust.
  • Mechanical penthouse was built utilizing open space on existing facility roof.

ACS Services: Integrated Project Delivery

Project Duration: 1 year, 5 months