Performance Test Cell Upgrade / Detroit Diesel Corp / Detroit, MI
Project Overview:
As part of the DDC development program for the off-highway engine line, ACS delivered four performance test cells along with corresponding control rooms and a 5,000 sq.ft. mechanical penthouse. The complex renovation was executed in an operating test and production environment and was delivered utilizing a phased workplan to meet the needs of ongoing operations.
Key Performance Features:
Mechanical penthouse was built utilizing open space on existing facility roof.
Maximized existing available space by converting the component test area into a new control room and emissions equipment room.
Siemens PLC systems installed for testing critical utilities including combustion air, fuel systems, engine coolant, aftercooler, and engine exhaust.
Mechanical penthouse was built utilizing open space on existing facility roof.
ACS Services: Integrated Project Delivery
Project Duration: 1 year, 5 months