Project Case Studies

The depth and breadth of ACS’ expertise and experience is best represented in the many successful projects we have completed. ACS has worked with clients all over the world to earn their satisfaction and build a project portfolio of which we can be proud. We invite you to discover more about our capabilities and experience by reviewing our representative projects.

Filter Projects By Category

Facilities & Equipment Integration

Displaying 1 to 6 of 38 Projects

industrial automation process, tier 4 emissions test

End-of-Line (EOL) Diesel Engine Test Cell Tier 4 Emissions Standards-Production Facility Addition

Building addition included end of line product test cell with emissions test capability for large, high horsepower (up to 6600HP) engines used in marine, locomotive, and industrial applications.

Project Features: Production Facility Addition, Relocation of Engine Assembly and Testing, New End of Line (EOL) Test Cell, High Horsepower Locomotive, Marine, Industrial Engines, Tier 4 Emissions Test Capability

Categories: Manufacturing/Production, Automotive & Commercial Vehicles, Test Cells, Facilities & Equipment Integration, Machines & Equipment

VIEW PROJECT DETAILS
r&d technical center greenfield site

Research and Development Technical Center Greenfield Site

New R&D Technical Center on a greenfield site includes 4WD EPA1066 chassis dynamometer test cell, SHEDs for evaporative emission testing, fuel room, vehicle soak space, two-story office area with collaboration space.

Project Features: Greenfield, New Construction, Design/Build, Turnkey Delivery, Test Equipment Procurement, Installation, integration, Facility & Equipment Integration, 4WD EPA1066 Chassis Dynamometer Test Cell, SHEDs for Evaporative Emission Testing, Fuel Room

Categories: R&D, Automotive & Commercial Vehicles, Test Cells, Integrated Buildings, Facilities & Equipment Integration

VIEW PROJECT DETAILS
acoustics consultant, acoustics engineer

Acoustics Consultant | Engineer for Automotive Technical Center

A UK-based supplier of automobiles sought ACS expertise and experience to serve as their test equipment integrator and acoustic consultant during the design phases of their consolidation of NVH test capabilities into a single new technical center. ACS provided design phase consulting, acoustic analysis, product specification, design integration, and planning for commissioning.

Project Features: NVH (Noise Vibration Harshness) Consulting, Acoustics and Vibration Analysis, Product and Test Equipment Specification, Design Phase Consulting, Test Equipment Design Integration, Test Equipment Commissioning Planning

Categories: R&D, Automotive & Commercial Vehicles, Noise & Vibration/NVH, Facilities & Equipment Integration

VIEW PROJECT DETAILS
4wd chassis dyno emissions test cell upgrade, vehicle test cell upgrade, acs expands michigan

4WD Chassis Dyno Emissions Test Cell Upgrade

The state-of-the-art facility develops and tests emission control systems based on advanced catalytic technology to provide automakers with solutions to meet regulatory requirements.

Project Features: Dynamometer, 4WD Chassis Dyno, Emissions, Drivetrain, Facility Expansion

Categories: R&D, Automotive & Commercial Vehicles, Test Cells, Integrated Buildings, Facilities & Equipment Integration, Machines & Equipment

VIEW PROJECT DETAILS
dyno test cell, chassis dyno test cell, modular enclosure test cells

4WD Chassis Dyno Test Cells Upgrade

Turnkey design, construction, integration and commissioning of four 4WD chassis dyno test cells capable of testing up to Class 4 trucks.

Project Features: 4WD Chassis Dyno, Road Speed Fan, Thermal Enclosure, Electric Vehicle (EV) Charging Infrastructure, Demolition, Renovation

Categories: R&D, Automotive & Commercial Vehicles, Test Cells, Facilities & Equipment Integration, Electrification

VIEW PROJECT DETAILS
generac research development facility, acs advance high tech jobs wisconsin

Generac R&D Lab Renovation

ACS designed and built the research and development space for Generac Power Systems, Inc. The renovation was transformed into a "like new" space previously used for manufacturing. ACS used critical chain methodology to manage scheduling and complexity of working in an operating facility.

Project Features: Alternator, Component Test, Transfer Switch Lab, Electronics Lab, Equipment Procurement & Integration, Preconstruction & Construction Management, Commissioning

Categories: Energy, R&D, Test Cells, Integrated Buildings, Facilities & Equipment Integration

VIEW PROJECT DETAILS

Displaying 1 to 6 of 38 Projects