Project Case Studies

The depth and breadth of ACS’ expertise and experience is best represented in the many successful projects we have completed. ACS has worked with clients all over the world to earn their satisfaction and build a project portfolio of which we can be proud. We invite you to discover more about our capabilities and experience by reviewing our representative projects.

Filter Projects By Category

Integrated Buildings

Displaying 1 to 6 of 20 Projects

r&d technical center greenfield site

Research and Development Technical Center Greenfield Site

New R&D Technical Center on a greenfield site includes 4WD EPA1066 chassis dynamometer test cell, SHEDs for evaporative emission testing, fuel room, vehicle soak space, two-story office area with collaboration space.

Project Features: Greenfield, New Construction, Design/Build, Turnkey Delivery, Test Equipment Procurement, Installation, integration, Facility & Equipment Integration, 4WD EPA1066 Chassis Dynamometer Test Cell, SHEDs for Evaporative Emission Testing, Fuel Room

Categories: R&D, Automotive & Commercial Vehicles, Test Cells, Integrated Buildings, Facilities & Equipment Integration

VIEW PROJECT DETAILS
4wd chassis dyno emissions test cell upgrade, vehicle test cell upgrade, acs expands michigan

4WD Chassis Dyno Emissions Test Cell Upgrade

The state-of-the-art facility develops and tests emission control systems based on advanced catalytic technology to provide automakers with solutions to meet regulatory requirements.

Project Features: Dynamometer, 4WD Chassis Dyno, Emissions, Drivetrain, Facility Expansion

Categories: R&D, Automotive & Commercial Vehicles, Test Cells, Integrated Buildings, Facilities & Equipment Integration, Machines & Equipment

VIEW PROJECT DETAILS
generac research development facility, acs advance high tech jobs wisconsin

Generac R&D Lab Renovation

ACS designed and built the research and development space for Generac Power Systems, Inc. The renovation was transformed into a "like new" space previously used for manufacturing. ACS used critical chain methodology to manage scheduling and complexity of working in an operating facility.

Project Features: Alternator, Component Test, Transfer Switch Lab, Electronics Lab, Equipment Procurement & Integration, Preconstruction & Construction Management, Commissioning

Categories: Energy, R&D, Test Cells, Integrated Buildings, Facilities & Equipment Integration

VIEW PROJECT DETAILS
test center expansion, diesel engine test cell, acs project case studies

Farmington Hills Expansion

ACS provided the complete design, procurement, construction and commissioning for the facility, as well as design and fabrication of the test equipment for a 28,000 square foot addition. The addition included a test space, machine shop, engine staging/build-up, offices, metrology, and warehouse/storage.

Project Features: Technical Center Expansion, Test, Engine Staging & Build-up, Offices, Warehouse & Storage, Data Acquisition, Facility Control PLC

Categories: Automotive & Commercial Vehicles, Integrated Buildings, Process Automation & Control, Machines & Equipment

VIEW PROJECT DETAILS
end line gen set production testing

End of Line Gen-Set Production Testing

The end-of-line production test stations were relocated to a more efficient area of the facility and integrated with the production/assembly area. Gensets testing includes multiple fuels; An Allen Bradley Safety PLC monitors all fuel safety related items in the test cells, including gas monitoring, gaseous valve control and other safety related items. The system interfaces with the test cell PLC/Cyflex system regarding cell readiness.

Project Features: Genset, Test, Automation, EOL, Data Acquisition, DAQ, Equipment Design, Production, Fabrication, PLC

Categories: Energy, Manufacturing/Production, Test Cells, Integrated Buildings, Facilities & Equipment Integration, Process Automation & Control, Machines & Equipment

VIEW PROJECT DETAILS
high horsepower technical center construction

High-Horsepower Technical Center/Engine Plant

The technical center expansion of an existing manufacturing facility doubles previous product development space. Scaling up test support systems and building infrastructure to accommodate large engines meant in-depth analysis of current systems and accurate projections of future requirements.

Project Features: Expansion, Renovation, R&D and Production Test, Engine Staging & Build-up, Offices

Categories: Manufacturing/Production, R&D, Automotive & Commercial Vehicles, Test Cells, Integrated Buildings, Facilities & Equipment Integration, Machines & Equipment

VIEW PROJECT DETAILS