ACS Project Case Studies

The depth and breadth of ACS’ expertise and experience is best represented in the many successful projects we have completed. ACS has worked with clients all over the world to earn their satisfaction and build a project portfolio of which we can be proud. We invite you to discover more about our capabilities and experience by reviewing our representative projects.

Filter Projects By Category

Manufacturing

Displaying 1 to 6 of 10 Projects

Aerospace Test Facility – Design and Pre-Construction

A multinational conglomerate with significant aerospace operations needed a new test facility to increase its production testing of a new shaft engine. Design criteria was validated and reviewed for constructability amid logistical and building site challenges.

Project Features: New 16,000 sq/ft. Aerospace Production Test Facility, Aerospace Shaft Engine Test, Design Criteria Development, Pre-construction Services, Budget Development, Schedule Planning

Categories: Aerospace, Facilities & Equipment Integration, Integrated Buildings, Manufacturing, Test Cells

VIEW PROJECT DETAILS

Cardinal IG Facility Expansion for Jumbo Glass Manufacturing Line

Facility renovations to accommodate equipment and processes for new product line as well as an addition to the facility to account for planned increase in production lines.

Project Features: Production Facility Renovation and Addition, 400,000 SF, Equipment and Processes for New Insulating Glass Product Line, Intense Power Requirements for Production Process

Categories: Integrated Buildings, Manufacturing, Process Automation & Control

VIEW PROJECT DETAILS
modular test enclosure, aerospace component, aerospace testing, aerospace end of line test

Aerospace Component Test Cell

Integrated test cell enclosure for end-of-line production testing within an existing facility was designed to correlate test cell takt time to production build volumes.

Project Features: Modular Integrated Test Cell, Structural Enclosure for End-of-Line (EOL) Testing, Acoustic Fire-rated Construction, 24/7 PLC-based Safety Instrumented System (SIS), NI™ LabVIEW Data Acquisition, Aerospace Component

Categories: Aerospace, Enclosures/Containerized Test, Manufacturing, Test Cells

VIEW PROJECT DETAILS
Large diesel engine End of Line (EOL) assembly test cell with Tier 4 emissions test capability

End-of-Line (EOL) Diesel Engine Test Cell Tier 4 Emissions Standards-Production Facility Addition

Building addition included end of line product test cell with emissions test capability for large, high horsepower (up to 6600HP) engines used in marine, locomotive, and industrial applications.

Project Features: Production Facility Addition, Relocation of Engine Assembly and Testing, New End of Line (EOL) Test Cell, High Horsepower Locomotive, Marine, Industrial Engines, Tier 4 Emissions Test Capability

Categories: Automotive & Commercial Vehicles, Facilities & Equipment Integration, Machines & Equipment, Manufacturing, Test Cells

VIEW PROJECT DETAILS
Articulating exhaust system for engine test cell ventilation accommodates a range of engine size and configurations

Engine Test Cell Ventilation | Articulating Exhaust Arm

Articulating exhaust arm for engine test cell ventilation of production test facility is designed for maximum versatility. One exhaust system is used across a wide spectrum of engine sizes and configurations.

Project Features: Engine Test Cell Ventilation, Combustion Exhaust, Test Cell Engine Exhaust, Articulating Exhaust Arm, Controls, Control Panels, Production Test

Categories: Automotive & Commercial Vehicles, Machines & Equipment, Manufacturing, Test Cells

VIEW PROJECT DETAILS
End of line systems for automated genset test enclosures and conveyor with integrated controls and data acquisition systems

End of Line Gen-Set Production Testing

The end-of-line production test stations were relocated to a more efficient area of the facility and integrated with the production/assembly area. Gensets testing includes multiple fuels; An Allen Bradley Safety PLC monitors all fuel safety related items in the test cells, including gas monitoring, gaseous valve control and other safety related items. The system interfaces with the test cell PLC/Cyflex system regarding cell readiness.

Project Features: Genset, Test, Automation, EOL, Data Acquisition, DAQ, Equipment Design, Production, Fabrication, PLC

Categories: Enclosures/Containerized Test, Energy, Facilities & Equipment Integration, Integrated Buildings, Machines & Equipment, Manufacturing, Process Automation & Control, Test Cells

VIEW PROJECT DETAILS

Displaying 1 to 6 of 10 Projects