ACS was engaged to create a modular skid design and fabricate a high-velocity spray tower and a media filter for Linde's carbon capture plant. The modular power plant skidded system tested new carbon dioxide capture technology for aerosol particle reduction.
Project Features: Modular Skid Design and Fabrication, Modular Pilot Plant Construction, Aerosol Particle Reduction Technology Test, Construction Management
Project Categories: Controls and Software, Energy, Machines and Equipment
A global heavy equipment manufacturer urgently needed to boost diesel generator testing capacity. ACS delivered a self-contained modular test system and managed the complex test cell construction to ensure every generator unit was tested immediately, strengthening long-term revenue and improving the overall generator testing procedure.
Project Features: Modular Test System, Generator Testing Procedure, Test Cell Construction, Diesel Generator Sets, Acselerant Software, Process Control and Data Acquisition, Facility Integration, Diesel Generator Testing
Project Categories: Building Design and Construction, Controls and Software, Energy, Test Cells and Test Stands
ACS engineered a rapid-deployment charging station to support the EV mining truck transition. By integrating a flexible industrial microgrid and a two-phase distribution strategy, we accelerated electrification in mining industry operations and reduced time-to-operation for megawatt-scale remote sites.
ACS transformed an existing generator test stand into sophisticated automated end of line systems. This upgrade allows the manufacturer to efficiently test multi-fuel genset, enhancing production capabilities for various fuel types including propane, natural gas, diesel, and gasoline.
Project Categories: Alternative Fuels, Building Design and Construction, Controls and Software, Enclosures and Containerized Test, Energy, Manufacturing, Ntandem Systems Integration, Test Cells and Test Stands
ACS designed and built the research and development space for Generac Power Systems, Inc. The renovation was transformed into a "like new" space previously used for manufacturing. ACS used critical chain methodology to manage scheduling and complexity of working in an operating facility.
Project Features: Alternator, Component Test, Transfer Switch Lab, Electronics Lab, Equipment Procurement and Integration, Preconstruction and Construction Management, Commissioning
Project Categories: Building Design and Construction, Energy, Ntandem Systems Integration, Research and Development (R&D), Test Cells and Test Stands