There’s No Better Time Than Now To Upgrade

May 21, 2021

Categorized in:


test cell upgrade, 3d model modular enclosure end of line (EOL) testing dual vane pump

Our teams have the experience and expertise to help you define your needs, engineer and design process and test systems, and deliver a test stand, material handling system, a modular enclosure solution or a complete turnkey test cell – all to meet your requirements. We’ve designed and built systems for engines, turbochargers, pumps, valves, gearboxes, actuators, fuel injectors, hydraulic components, transmissions, spray nozzles, and many more.

In-process or end-of-line functional test stations can be stand-alone, integrated with material handling, or fully integrated into your facility layouts and systems.

Modular or containerized test cells provide a portable and economical way to conduct product testing for in-line production, end-of-line production, durability testing, certification, and R&D.


test cell upgrade, Customer increased capacity for end-of-line testing at an existing facility with minimal to no on-site construction. ACS' Solution was fully integrated into their facility. The cell is self-contained and portable within the facility.

Integrated Test Cell Increases EOL Production Testing

Customer increased capacity for end-of-line testing at an existing facility with minimal to no on-site construction. Solution was fully integrated into their facility. The cell is self-contained and portable within the facility.

Read More About This Project

test cell upgrade, What started out during design as a system of skids became a complete modular test cell enclosure. It fits perfectly in the existing lab space designated for new testing capabilities of filtration products.

Fuel Filtration Product Test Stand

What started out during design as a system of skids became a complete modular test cell enclosure. It fits perfectly in the existing lab space designated for new testing capabilities of filtration products.

Read More About This Project


acs wins top work places 2021 from wisconsin state journal, test cell upgrade

ACS, an equipment, controls, and facility solutions provider, headquartered in Verona, Wisconsin, has been named a ‘Top Workplace’ by the Wisconsin State Journal, for the third consecutive year. Read full story HERE.


test cell upgrade, acs will have a booth at the noise and vibration conference and exhibition expo in grand rapids, michigan on september 7-10, 2021

Our very own, Randy Rozema INCE Bd Cert, Principal/Mechanical Engineer – Acoustics/Vibration, along with two representatives from Autoliv, will be presenting a paper entitled, “Autoliv’s Sound and Vibration Laboratory for Automotive Safety Component Development.” Join online or in person. Register and find out more information HERE.

Under Randy’s leadership, ACS offers noise and vibration services for a wide range of applications.


test cell upgrade, affiliated construction services will exhibit at the assembly show in rosemont, illinois from october 26-28, 2021

Join us in-person at the Assembly Show this Fall! We’re looking forward to seeing you at our booth #905. We’re ready to help you improve your processes.

At the show, you’ll find everything you need to improve your assembly operation, whether you’re going lean, incorporating automation into your line, focusing on quality control, or upgrading equipment and retooling to streamline operations. Register and find out more information HERE.


Other ACS Newsletters

3 challenges building test center
Three Top Challenges to Building a Test Center
09-09-21
process equipment design, process equipment design, mechanical design of process equipment
Bring Your Innovative Designs To Life
07-08-21
test cell upgrade, 3d model modular enclosure end of line (EOL) testing dual vane pump
There’s No Better Time Than Now To Upgrade
05-21-21
automation and controls upgrade services
ACS Automation and Controls
03-23-21