Aerospace Fuel Pump Test Cell Replacement Extends Facility Life
October 29, 2026 -
Project Features:
Modular Skidded Test Cell, Integrated Facility Utilities, High-Pressure Acceptance Testing (ATP), Custom High-Pressure Control Valves, Thermal Load Management, 3D Laser Scanning and Spatial CAD Modeling, Zero-Demolition Constrained Space Retrofit, Aerospace Engine Fuel Pump Testing
Integrated Aircraft Engine Test Cell Design Overcomes Space Constraints for Eaton
To overcome tight spatial constraints and meet demanding performance standards, Eaton Corporation needed a modernized aircraft engine test cell design capable of testing high-capacity fuel systems under extreme flight conditions. ACS delivered comprehensive aerospace test solutions by integrating modular skids, high-pressure valves, and legacy plant utilities into a single high-performance system. This custom aerospace fuel pump test cell expanded testing envelope capabilities without requiring new facility construction.
The Challenge
Global aerospace solution manufacturer, Eaton Corporation, needed to replace an aging test cell with one that could support large engine aircraft fuel pumps. The new cell had to test a wider range of flight condition scenarios, while fitting within the existing test cell’s tight physical space.
ACS won this project based on the comprehensiveness of its aerospace test solutions and a long-standing partnership. Rather than propose the test system as a standalone test stand, the ACS design team treated the test cell and facility as a single integrated system. ACS structured its scope to focus on the integrated test cell and facility upgrade, providing a flexible delivery model that fit Eaton’s project approval and investment framework.
The Solution
Delivering on ACS’ integrated approach meant solving three interlocking problems: engineering a test cell capable of supporting Eaton’s full pressure and flow envelope; tying that cell into the plant’s older steam and chilled water systems; and fitting the complete test cell into a constrained space never intended to hold such equipment density and performance.
Engineering to the Full Flow and Pressure Envelope
To satisfy rigid Acceptance Test Plans (ATPs), the new test cell must replicate a wide range of flight conditions, from low-flow, lower-pressure scenarios to high-demand maneuvers at elevated pressure and flow rates.
ACS’ original aircraft engine test cell design used Pressure-Reducing Valves (PRVs) to step pressure down – a scheme expected to be more economical since the valves and downstream hardware could be lower-pressure rated. The ACS team built a prototype PRV stand, which it tested by inserting it into a similar test cell at Eaton’s facility. During testing, the team was able to refine the operating requirements and used those insights to replace the original PRV concept with three large high-pressure valves, custom-made to ACS’ specifications.
Designing One Integrated System
ACS designed the test cell to draw on the facility’s steam and chilled water systems. Because the existing infrastructure cannot support running all four of the test system’s steam heat exchangers at once, ACS defined a diversity factor and operating conditions that limit how many may be run at once. Those rules ensure Eaton can complete all required functional and ATP testing safely. By designing in all four, ACS gives Eaton a clear path to increase test capability through facility upgrades.
Working within an older facility also meant protecting the new equipment. For example, ACS added strainers to the incoming chilled water to filter out debris from the corroded facility piping before it reached a heat exchanger. ACS also worked with Eaton to identify and mitigate severely corroded chilled water piping upstream of the connection to ACS’ new equipment.
Packaging the Test Cell
Using a 3D laser scanner to capture the available space down to the millimeter, ACS built a 3D CAD model of the test cell, measuring roughly 16.5 feet by 21 feet. Using this model, ACS engineers worked from the steam and chilled water tie-in points, then laid out each component and pipe bend so that pressure drops and flow paths met design constraints, down to the slight slopes needed in steam lines to drain condensate properly.
ACS arranged the system into nine skidded sections, each sized to fit through the existing double man-door into the aerospace fuel pump test cell. The sections were assembled and tested off-site to validate compliance, then broken down and re-assembled on-site with flanged pipe connections, manufactured to meet strict requirements. With the 3D model, ACS engineers efficiently reconfigured the piping layout from the PRV design to accommodate the three large valves.
The Outcome
ACS’ flexible scope and aerospace test solutions delivery model helped Eaton facilitate the project through approval. The result is a robust aerospace fuel pump test cell that meets its demanding, broad range of ATP requirements, without requiring any new construction. By treating the test cell and older plant as a single engineered system and designing in excess equipment capacity, ACS delivered both equipment and targeted facility upgrades that extend the life and capability of the existing site, enabling Eaton to take an incremental approach to future upgrades.
Key Features
- Test cell piping and facility utilities engineered into a single integrated system
- Complex piping layout that routes many interdependent flow paths to support a broad test envelope
- Three large high-pressure control valves engineered to ACS specifications with zero tolerance for deviation
- One chilled water and four steam heat exchangers, including one custom, high-pressure rated unit to handle the thermal load of the unit under test
- Full system broken into multiple skidded sections, each sized to pass through facility’s entry, avoiding any demolition
ACS Services
- Project management
- Test cell and facility integration
- Mechanical and piping systems design
- Custom equipment specification and fabrication
- Equipment supplier management
- 3D scanning and spatial/CAD modeling
- Prototype development and design validation
- Onsite installation and management
- Start-up and commissioning services




