Building Commissioning Services and Turnover

Full Functionality – Guaranteed!

From the initial stages of planning and design through construction, ACS never loses sight of what your facility needs to do when it’s complete. Our expertise through all phases of project delivery ensures that the final facility matches the design intent.

ACS Building Commissioning Services – Functional Performance Testing

ACS defines building testing and commissioning services as a proactive, integrated process for achieving, verifying and documenting building and systems components. Our process is implemented throughout the project, beginning in the pre-construction phase. ACS provides the direction for the commissioning process, providing details such as scheduling, participation of various parties, actual lines of reporting, level of documentation, development of pre-functional testing requirements and development of detailed functional performance test procedures. We also conduct Factory Acceptance Testing (FAT) on equipment that’s manufactured or assembled in our facility, to verify functionality as well as minimize costly onsite troubleshooting.

Commissioning Phased Services

Construction Phase

  • Conduct kick-off meeting
  • Review start-up forms and manufacturer specific information
  • Develop detailed equipment-specific testing procedures and documentation
  • Conduct periodic observation testing and attend progress meetings
  • Request operations and maintenance manuals from design and construction entities
  • Contractors complete static testing and equipment/systems start-up and submit documentation for review
  • Review contractors’ maintenance programs for client maintenance staff

Acceptance and Testing Phase

  • Check start-up and balancing reports
  • Conduct functional performance testing with participation from all members of the commissioning team
  • Document performance testing and compile all design, operation, and maintenance information
  • Develop and conduct facility and systems overview and operational design intent training
  • Verify that Acceptance Criteria have been met

functional performance testing commissioning, building commissioning services, commissioning in construction

Education and Training

Staff knowledge of your equipment and integrated industrial facility helps ensure uptime and data integrity. ACS provides customized education and training programs through a combination of classroom and hands-on sessions at your site. Operators, maintenance, engineers and IT personnel benefit from a more formal understanding of the equipment, process support systems and the impact of the facility utilities to ensure operational readiness.

Building Commissioning

  • Factory Acceptance Testing (FAT) of major equipment
  • Facility equipment commissioning
  • Test equipment commissioning
  • Develop commissioning procedures
  • Start-up and balancing
  • Functional performance testing

Acceptance Testing

  • Final development of Acceptance Testing Procedures (ATP)
  • Execution of ATP
  • Equipment and systems integration

Training and Handover

  • Final documentation
  • O&M documentation
  • Operator education and training
  • Operational readiness

Related Projects

engine manufacturing test facility
Engine Manufacturing & Production Test Facility
ge turbocharger test cell
Emissions Turbocharger Test Stand & Controls
engine development test cell upgrade
Engine Development Emissions Test Cell Upgrade
Central Facilities & Safeties for Four R&D Test Cells